a

Between the 15th and the 18th of July, 2024, on the road section between Nagyerdei Boulevard  68 and 76 a half-lane large road resurfacing was carried out, which will continue with the levelling of the sunken manhole covers in the section between the Pálma restaurant and No. 68, and the local repair of the asphalt pavement.

The works will start on Saturday the 3rd of  August 2024 and are expected to continue until Thursday, the 8th of August 2024 with localised and half-lane road closures.

Drivers are asked to drive with increased caution, not out of habit, but in accordance with the temporary road signs posted!

Source:debrecen.hu