a

The development works of the Erzsébet Street—Szoboszlói Road—Külsővásártér junction in Debrecen will enter a new phase on April 22, 2025.

The outer lane on Nyugati Street will be closed. Turning right onto Széchenyi Street will be prohibited, but turning right onto Postakert Street will temporarily be possible again.

Postakert Street will remain a dead-end street from Zelemér Street. The odd-even side of the Külsővásártér will be narrowed down to an inn lane in front of the Mechwart school. The connection of the Arany János Street junction to the Külsővásártér junction will be closed. 

The street will be accessible by opening the end of the Külsővásártér service road, with one-way traffic.

The work is expected to last until the end of the school term, between 22 April 2025 and 30 June 2025.

Drivers are requested to follow the signs to introduce the temporary traffic order.

Source and photo credit: debrecen.hu